Sun Microsystems SG-XPCIE20FC-NEM-Z Manual de usuario Pagina 29

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 28
Chapter 2 Hardware Installation and Removal 13
FIGURE 2-3 Connecting the Optical Cables
2. Connect the other end of each cable to a FC device.
After the optical cables are connected to the NEM, proceed to “Configuring the NEM
For Hot-Plug Operation” on page 14.
3. Observe the light-emitting diodes (LEDs) status for the power-on self test
(POST).
Each port has a corresponding set of LEDs that provide a visual indication of the
operating state. See
FIGURE 2-4 to determine the location of the port LEDs.
Vista de pagina 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 67 68

Comentarios a estos manuales

Sin comentarios